Gostern Wire rope rigging /Chain rigging /Lifting rigging

NEWS

Featured products

Application: Ship, iron and steel industry, petroleum chemical industry, coal mine
Application: Can use on different pulley or hoist, lever hoist and electrical hoist.
Application: Ship, iron and steel industry, and other decorative function sucn as pet and lock the door. Also can use on hoist and pulley.
Can hold such as: the tube, pipe, oval pipe, rectangular pipe, H-beam, I-beam, container and other big constructure.
Stud Link and Studless Link Anchor Chain are widely used on Floating Equipment, Ships(Boats), Oil Rigs and Mooring Buoys.
The anchor chain is made up of many links, and the size of the chain is shown as diameter-MM

Product Introduction – Drum Lifting Clamp

1. Applicable Drums 

Ordinary steel drums

Steel drums with top iron rim Standard blue plastic drums (without outer hoop)

Not suitable: Blue plastic drums fitted with external iron hoop

Structure: Double-chain double jaw design, equipped with main lifting link for overhead crane lifting.

 

2. 3-Jaw Drum Lifting Clamp

Rated Load: 750 kg

·Opening range: 350360 mm

·Lifting eye diameter: 40 mm

Standard supply: Chain NOT included (lifting chain needs separate purchase)

Applicable Drums Compatible with common 200L steel drums, steel drums with rim and regular blue plastic drums. Structure: 3-point gripping structure for balanced force distribution and stable clamping.

 

Safety Instructions & MaintenanceImportant Notices

1. The drum lifting clamp is used to lift various drums, including open-top steel drums and different types of metal transfer bins.

2. If the spring fails, manual operation can still reset the clamp.

3. The clamp can be used to lift drums partially filled with materials.

4. Lifting drums without flange rim is dangerous, as the jaw may slip off. Reinforcement via welding or bolts is mandatory for rimless drums.

5. Overload lifting is strictly prohibited.

Maintenance Guidelines

1. Lubricate all moving parts with light-duty lubricant every 10–15 days.

2. Keep the clamp clean. Remove dirt and contaminants regularly to extend service life.

3. Frequently inspect springs and hinge pins. Stop use immediately if abnormal movement or damage is found.

Operating Procedure

The diagram demonstrates standard operating methods: lock the jaws firmly onto the top flange of the drum for vertical lifting or angled transportation.

Selection Guidance

2-Jaw Wide Body (1 Ton) Advantages: Pre-assembled G80 chain; compatible with steel & standard plastic drums; higher working load. Limitation: Cannot be used for plastic drums with outer iron hoop.

3-Jaw Type (750 kg) Advantages: Three-point secure grip, wider drum compatibility. Limitation: Lower rated capacity; chain is not included as standard.

image.png

Leave Your Message